![]() ATS previously upgraded APS’ building automation system (BAS) to Tridium Niagara N4. ATS Rocky Mountain was ultimately chosen to install the system due to their experience with HVAC controls at APS, as well as their expertise in EIS and facility analytics.ĪPS utilizes various manufacturer’s control products throughout their schools, therefore they needed an EIS vendor that could integrate into any of the different systems. Working with the utility, the District issued an RFP to install an EIS. The utility developed an incentive program that provides consultative services to identify energy saving actions and covers up to 30% of the cost of an EIS installation. To achieve APS’ energy efficiency goals, Wright began discussing implementing an Energy Information System (EIS) with the local utility, Xcel Energy. Energy Information Systems & ATS Rocky Mountain An EIS typically includes facility benchmarking, equipment fault detection, metering, and automated optimization tools. What is an Energy Information System?Īn EIS provides facilities a tool to visualize energy usage and identify energy wasting activities. Although the District has been reducing energy usage, Craig Wright, Natural and Renewable Resource Manager for APS, knew the team would have to step up their efforts to achieve their full 20% reduction goal. of Energy’s Better Buildings Challenge with the goal of reducing energy use by 20% over a 10-year period ending in 2023. In 2014, the District’s Maintenance and Operations team started an initiative to focus on saving energy at schools. Managing energy use in a district that size is no simple task. ![]() APS currently has over 40,000 students enrolled in 63 different schools. Aurora Public Schools (APS) has served students from Aurora, CO for over 120 years. ![]()
0 Comments
Leave a Reply. |